Instrument Transformer Secondary Grounding
Updated 2026-10-13
Data records
- Instrument Transformer Secondary Grounding is specified for current transformers in acceptance testing at clause 7.10.1.B.9 of ANSI/NETA ATS-2025. Value: current transformers.
- Instrument Transformer Secondary Grounding is specified for current transformers in maintenance testing at clause 7.10.1.B.10 of ANSI/NETA MTS-2023. Value: current transformers.
- Instrument Transformer Secondary Grounding is specified for medium-voltage and high-voltage surge arresters in acceptance testing at clause 7.19.2.B.3 of ANSI/NETA ATS-2025. Value: medium-voltage and high-voltage surge arresters.
- Instrument Transformer Secondary Grounding is specified for medium-voltage and high-voltage surge arresters in maintenance testing at clause 7.19.2.B of ANSI/NETA MTS-2023. Value: medium-voltage and high-voltage surge arresters.
- Instrument Transformer Secondary Grounding is addressed in ANSI/NETA ATS-2025.
- Instrument Transformer Secondary Grounding is addressed in ANSI/NETA MTS-2023.
- The test method is named Instrument Transformer Secondary Grounding. Value: Instrument Transformer Secondary Grounding.
Elsewhere in the family
- Transformer Turns Ratio related entry on Transformer Testing Reference
- Current Circuit Injection related entry on Electrical Testing Reference
- Current circuit injection related entry on Switchgear Testing Reference
- ANSI/NETA ATS-2025 Standard for Acceptance Testing Specifications related entry on Electrical Testing Reference
- ANSI/NETA MTS-2023 Standard for Maintenance Testing Specifications related entry on Electrical Testing Reference
Sources
- ANSI/NETA ATS-2025, Acceptance Testing Specifications for Electrical Power Equipment and Systems, 2025 edition, NETA. Cited: clause 7.10.1.B.9; clause 7.19.2.B.3. Held as: Purchased single-user copy. Publisher page
- ANSI/NETA MTS-2023, Maintenance Testing Specifications for Electrical Power Equipment and Systems, 2023 edition, NETA. Cited: clause 7.10.1.B.10; clause 7.19.2.B. Held as: Purchased single-user copy. Publisher page
- Electrical Testing Reference editorial taxonomy, Electrical Testing Reference editorial taxonomy of test methods, 2026-10 edition, Electrical Testing Reference. Held as: Own observation.
Obtaining the documents
- ANSI/NETA ATS-2025: publisher catalog or sales page
- ANSI/NETA MTS-2023: publisher catalog or sales page
Changelog (7 entries)
| Date | Revision | Change |
|---|---|---|
| 2026-10-13 | created (tests.instrument-transformer-secondary-grounding.equipment.instrument.acceptance) | |
| 2026-10-13 | created (tests.instrument-transformer-secondary-grounding.equipment.instrument.maintenance) | |
| 2026-10-13 | created (tests.instrument-transformer-secondary-grounding.equipment.surge.acceptance) | |
| 2026-10-13 | created (tests.instrument-transformer-secondary-grounding.equipment.surge.maintenance) | |
| 2026-10-13 | created (tests.instrument-transformer-secondary-grounding.governed-by.ansi-neta-ats) | |
| 2026-10-13 | created (tests.instrument-transformer-secondary-grounding.governed-by.ansi-neta-mts) | |
| 2026-10-13 | created (tests.instrument-transformer-secondary-grounding.title) |
Cite this page
Cite the governing standard for the fact itself; cite this page as the finding aid.
"Instrument Transformer Secondary Grounding." Revenue Metering Reference. 2026-10-13. https://www.revenuemeteringreference.com/tests/instrument-transformer-secondary-grounding/.
Revenue Metering Reference, Instrument Transformer Secondary Grounding (Oct. 13, 2026), https://www.revenuemeteringreference.com/tests/instrument-transformer-secondary-grounding/.
@misc{etr-tests-instrument-transformer-secondary-grounding,
title = {Instrument Transformer Secondary Grounding},
howpublished = {\url{https://www.revenuemeteringreference.com/tests/instrument-transformer-secondary-grounding/}},
organization = {Revenue Metering Reference},
publisher = {Revenue Metering Reference},
year = {2026},
note = {last substantive change 2026-10-13}
}{{cite web |title=Instrument Transformer Secondary Grounding |website=Revenue Metering Reference |publisher=Revenue Metering Reference |url=https://www.revenuemeteringreference.com/tests/instrument-transformer-secondary-grounding/ |date=2026-10-13 |access-date=}}